Facade Restoration: A Guide for Building Owners

Most facade restoration projects start with something small. A piece of coping lands on the pavement, a crack opens above a window, or a leaseholder reports damp on an inside wall that nobody can explain. By the time an owner picks up the phone, the question is rarely whether work is needed. It is how much, how soon, and what it will cost to find out.

A facade does three jobs at once. It keeps weather out, it carries load, and on many buildings it plays a part in fire performance. Restoration means putting those three back in order without stripping the building of the character that made it worth keeping. This guide covers what the work involves, the defects behind most schemes, the consents owners forget, and the checks worth making before anyone puts up scaffolding.

The term stretches a long way. At one end it means repointing and localised brick replacement on a Victorian terrace. At the other it means stripping and rebuilding a failed external wall on a residential block, with structural alterations behind it.

Most schemes sit somewhere between the two: repointing in a mortar that matches the original, cutting out and replacing spalled brick or stone, stone indents and mortar repairs, cleaning, render repair or recovering, replacing cills, copings and parapets, renewing sealant and movement joints, repairing rainwater goods, redecorating joinery, and reinstating the ironwork that carries balconies and railings.

What separates a restoration from a repair is scope and sequence. Repairs chase defects one at a time. A restoration takes the whole elevation, works out why it is failing, and fixes the cause while the access is up. Access is usually the single most expensive item on the job, so the economics push hard towards doing everything at once.

Six causes account for most of the facade work we see in London and the South East.

Cladding and external wall systems sit alongside all of this and follow a different route, driven by fire safety rather than weathertightness. Where a building has a cladding system and residential units, that assessment comes first and shapes everything else.

The most common mistake in facade work is pricing a scheme from a visual inspection taken at ground level. Binoculars find the obvious. They miss hollow render, loose pointing, failed ties and the condition of the backing masonry entirely.

A proper facade condition survey means close inspection of the elevations, by mast climber, mobile elevating work platform, rope access or a scaffold erected for the purpose. It should include opening up at agreed locations, mortar analysis where the building is historic, and tie testing where the construction warrants it. Rope access is usually the cheapest way to inspect a tall elevation, and the cost is trivial next to a contract sum built on guesswork.

What the survey produces is an elevation-by-elevation schedule with quantities. That schedule is what gets priced. Without it, every tender describes a different scheme and the comparison means nothing.

Facade work touches more regulatory regimes than almost any other kind of building work, and the permissions sit with different bodies on different timescales.

  1. Has anyone diagnosed the cause, or only described the symptom? A schedule that says “repoint defective areas” without saying why they are defective will produce the same defect again in fifteen years.
  2. Is the scope based on measured quantities? Provisional sums are where facade budgets go to die. Reduce them to the areas genuinely unknowable until access is up.
  3. Who carries the opening-up risk? Agree before tender what happens when the backing masonry is worse than the survey suggested, and how it gets valued.
  4. Is the access strategy priced and licensed? Access can be a third of the cost. It also drives the programme, the neighbour relations and the licence conditions.
  5. Have the consents been started? Listed building consent, highway licences and section 20 each run on their own clock, and none of them can be compressed at the end.
  6. Does the specification name the materials? Mortar mix, sand source, brick match, stone bed and finish. “To match existing” is an argument waiting to happen.

Four failures account for most of the facade disputes we are asked to look at. The survey was done from the ground, so the contract sum was wrong before anyone signed it. The access went up before the consents were in, and the scaffold stood idle on a licence that cost money every week. Nobody specified the mortar, so the contractor used what was to hand, and the repointing now reads as a stripe across the elevation. Or the section 20 consultation was treated as paperwork to catch up on later, and the landlord finished the job unable to recover the cost.

None of those are construction problems. They are decisions taken before the work started, by people who had not been told what the decision would cost.

Q10 Consulting works on facade restoration across London and the South East as Principal Contractor, Contract Administrator and Quantity Surveyor, under the JCT form that suits the procurement route. That means commissioning the right survey before anything is specified, turning it into a schedule that can actually be priced, handling the consents on their own timescales, and running the work once it starts.

If you have a facade with cracking, spalling or water getting in, and quotes that vary more than they should, the usual reason is that each contractor has priced a different scheme. The fix is a measured schedule everybody prices against, and it is worth having before the tenders go out.

JCT Contracts: Which Form Fits Your Project

Most of the construction disputes we are asked to unpick did not begin with bad building. They began with the wrong JCT contract, or the right one used badly. The form you sign decides who carries the design risk, how long the employer has to answer a delay claim, and what happens to the money if the job stops. This guide covers the main JCT contract families, what actually changed in the 2024 editions, and the five checks worth making before anyone signs.

A JCT contract is a standard form published by the Joint Contracts Tribunal and used on a large share of UK building projects. Its job is to allocate risk before anything goes wrong: who designs what, who carries the cost of the unexpected, how variations are valued, when payment falls due, and what either party can do if the other fails to perform.

Standard forms matter because the alternative is bespoke drafting nobody has tested. A JCT contract carries decades of case law behind it, and an estimator, a quantity surveyor and a solicitor will all read the same clause the same way. That removes a layer of argument before it starts.

Completed residential scheme handed over under a JCT contract

There are more forms than most clients need to know about. In residential and mixed-use work, four cover almost everything:

Beyond those sit Construction Management, Management Building, Measured Term, Framework and the Homeowner forms, each built for a particular procurement route. Choosing between them comes down to two questions: how much design is the contractor taking on, and how much price certainty does the employer need before work starts.

JCT began rolling out the 2024 Edition with the Design and Build family on 17 April 2024, followed by the Standard Building Contract, Intermediate and Minor Works families through the rest of the year. The Complete Edition was announced in December 2024, with the remaining families published across 2025. The changes below are those in the Design and Build 2024 form; the other families differ in places.

The building safety drafting is the part worth watching. It handles Building Regulations notices and fees competently enough, but it does not address dutyholder declarations outside higher-risk buildings, and it merges the CDM and Building Regulations principal contractor and principal designer roles into one clause. On any project touching the Building Safety Act, expect amendments rather than relying on the published form.

Strip-out and structural works in progress, the stage where JCT contract variations usually arise

Four failures account for most of what we see. A letter of intent intended to cover enabling works quietly runs the whole job, so there is no executed contract when the dispute arrives. Instructions are given verbally and confirmed later, or not at all. Certificates slip past their dates, which hands the contractor an argument on payment. And nobody reads the amendments until it matters, by which point the risk has already moved.

None of these are drafting problems. They are administration problems, and they are avoidable with someone named and accountable for running the contract from the start.

Refurbished Edwardian townhouse handed over at practical completion

Q10 Consulting acts as Employer's Agent, Contract Administrator and Quantity Surveyor on residential and mixed-use projects across London. That means advising on which JCT contract suits the procurement route before anything is signed, then running it properly once it is: valuing variations, certifying payment on time, and dealing with delay claims on the evidence rather than on the exchange of letters.

If you are weighing up a procurement route, or you have a contract in front of you that does not look right for the job, it is worth a conversation before signature rather than after.

AI in Construction UK: 6 Uses That Actually Work

Talk about AI in construction tends to swing between two extremes: robots on every site within five years, or a passing fad the industry can safely ignore. The reality in 2026 is quieter and more useful than either. Adoption is still low, most of the gains are in paperwork rather than on the tools, and the firms getting real value are the ones that picked one narrow problem and solved it properly. This guide looks at where AI in construction UK projects is genuinely helping, where it falls short, and how to start without creating new risk.

AI in construction is still a minority activity, and the numbers are not close.

Construction is one of the slowest sectors in the country to adopt AI. In Office for National Statistics data for June 2026, around 35% of UK businesses with ten or more staff were using at least one AI technology. In construction the figure was 13% — among the lowest of any industry, and well behind information and communication at 58%. Government research earlier in the year found that nearly nine in ten construction businesses were neither using AI nor planning to.

That is starting to shift. The RICS 2026 report on AI in commercial property and construction found regular use in specific processes among construction professionals rising from 12% to 19% in a year. The UK remains the most cautious region in that survey, but it is also the one closing the gap fastest. The most common stage is still the early pilot — very few firms have AI embedded in everyday work.

These are the applications of AI in construction that UK firms report getting value from today, in rough order of how quickly they pay back.

1. Finding and summarising documents

Specifications, contracts, meeting minutes and operation and maintenance manuals run to thousands of pages on even a mid-sized project. AI search tools can find the relevant clause in seconds and summarise a long document in plain English. It is the least glamorous use on this list and, for most firms, the one that pays back fastest.

2. Estimating and quantity take-off

Tools that measure quantities from drawings and produce a first-pass cost plan save hours at tender stage. They do not replace the quantity surveyor — someone still has to understand what the drawings leave out — but they shift the surveyor’s time from measuring towards judgement.

3. Programme and risk analysis

AI can review a programme against progress data and flag patterns that suggest slippage before it shows up on the critical path: trades running behind, sequences that clash, activities with no float left. Used well, it gives the project manager an earlier conversation rather than a later apology.

Site team laying floor screed during a refurbishment project

4. Site progress and quality from photographs

Photographs and 360-degree capture can be compared automatically against drawings and the programme to show what has actually been installed. That supports valuations, speeds up snagging and gives clients a clear record of progress without anyone walking every floor with a clipboard.

5. Health and safety monitoring

Camera systems can flag missing PPE, people inside exclusion zones around plant, or blocked escape routes. They are an extra pair of eyes rather than a substitute for supervision, and any system that monitors workers needs a clear data protection basis and an honest conversation with the workforce.

6. Compliance evidence and the golden thread

Building safety regulations require accurate, accessible information about higher-risk buildings at every stage, and incomplete evidence is one of the main causes of Gateway delays. AI tools that organise, tag and cross-check project records make that evidence far easier to assemble — provided the underlying information is right in the first place.

Robotics and autonomous sites remain well behind the rest of the adoption curve. Outside a few specialist tasks, the fully automated site is still a conference slide rather than a UK reality.

The bigger limitation is data. AI can only work with the information it is given, and construction information is famously scattered across emails, drawing registers, spreadsheets and site diaries. Poor records in means confident but wrong answers out.

That confidence is the real risk. An AI tool will produce a plausible answer to a contract question or a design query whether or not it is correct. Nothing it produces should go into a design, a contract or a safety document without someone competent checking it.

And AI does not carry responsibility. Under CDM 2015 and the Building Safety Act, accountability sits with named dutyholders — the client, the principal designer, the principal contractor. None of that transfers to software. The RICS professional standard on the responsible use of AI in surveying practice, in force since March 2026, reflects the same principle: professionals remain answerable for any work AI helped produce.

The regulatory direction and the technology direction point the same way. As part of its plans for a single construction regulator, the government intends to require building information to be findable, accessible, interoperable and reusable across a building’s whole life, and it is developing a digital roadmap for building control. The same organised information that satisfies the new building safety regulations is exactly what AI tools need in order to be useful.

AI in construction is already making parts of the job faster, and UK adoption will keep climbing from a low base. What it will not change is the part of the job clients actually pay for: judgement on site, honest advice, and people who stand behind their work. The firms that do well will be the ones using AI to clear the paperwork out of the way so their people can spend more time on that.

Q10 Consulting combines established construction expertise with a practical view of AI in construction, across consultancy, procurement and delivery as main contractor. If you have a project coming up, get in touch for an initial conversation.

Building Safety Regulations: 7 Changes for 2026 and 2027

Building safety regulations in England are going through their biggest period of change since the Building Safety Act came into force. The autumn of 2026 alone brings a second staircase requirement for tall residential buildings and a new levy on residential development. Behind those sit a regulator that has been rebuilt, an approvals process that is finally speeding up, new energy standards and plans for a single construction regulator. This guide sets out the seven changes that matter most, when each one takes effect, and what they mean if you are commissioning, designing or building over the next two years.

Seven changes to building safety regulations matter most. Some are already in force, some land within days, and some are still working their way through Parliament.

On 27 January 2026 the Building Safety Regulator left the Health and Safety Executive and became an independent public body sponsored by the Ministry of Housing, Communities and Local Government. The move followed a difficult 2025 in which approval delays held up hundreds of projects, and it is the first practical step towards the single construction regulator recommended by the Grenfell Tower Inquiry.

For anyone working under building safety regulations, the change of structure matters less than the change of focus. The regulator now deals only with buildings, and its stated priorities include more site inspections and tackling the national shortage of building inspectors. Expect closer scrutiny of competence and records, not less.

Gateway 2 is where building safety regulations bite hardest on a programme.

Higher-risk buildings — those at least 18 metres or seven storeys with two or more homes, plus hospitals and care homes of that height during design and construction — cannot start on site until the regulator has approved the building control application at Gateway 2. In the summer of 2025, fewer than four in ten new-build applications were being approved and the median wait was 43 weeks.

The picture a year on is far better. In the regulator’s data for summer 2026, more than nine in ten decisions on new higher-risk buildings were approvals, and the median time had fallen to around 22 weeks. The target is 18 weeks for non-complex applications by March 2027. The latest Gateway 2 figures are published on GOV.UK.

Two points are easy to miss. First, refurbishment inside an existing higher-risk building goes through the same gateway, and those decisions have been taking longer than new build. Second, the quality of the application is now the main factor within your control — incomplete or inconsistent submissions remain the most common reason for delay.

From 30 September 2026, amended Approved Document B requires two protected staircases in any new residential building where the top storey is 18 metres or more above ground level, alongside revised guidance on evacuation lifts, protected lobbies and minimum stair widths.

External escape staircase providing a second means of escape from a block of flats

Schemes that made a building control application before that date can keep the previous rules, but only if the work is sufficiently progressed within 18 months — in practice, foundations poured or piling started by 30 March 2028. A scheme that stalls on site loses that protection and needs a fresh application under the new rules. Existing buildings are unaffected. The government announcement sets out the background.

The levy is a charge rather than a technical standard, but it is collected through the same building control process as the rest of the building safety regulations.

From 1 October 2026, building control applications for new residential developments of at least ten homes, or 30 bedspaces of purpose-built student accommodation, attract the Building Safety Levy. It is charged per square metre of new residential floorspace at rates set for each local authority area, with a 50% reduction on previously developed land. The government expects it to raise around £3.4 billion over ten years to fund the remediation of unsafe existing buildings.

Applications made before 1 October fall outside the levy. Non-profit registered providers of social housing are exempt, and refurbishment that creates no new homes is not caught — but conversions and extensions that add ten or more dwellings are. Crucially, a completion certificate will not be issued until the levy is paid. The government has also consulted on raising the threshold for smaller schemes, so check the current position before appraising a site.

This is where building safety regulations meet day-to-day building management.

Since 6 April 2026, the responsible person for high-rise and certain medium-rise blocks of flats must offer personal emergency evacuation plans to residents who may need help leaving the building in a fire, and keep building-level evacuation information up to date.

Fire doors, emergency exit sign and alarm panel on a communal escape route

For contractors working in occupied buildings this adds a practical duty. Any works affecting escape routes, lifts or fire doors need planning around those evacuation arrangements from the outset, rather than being discovered part-way through the programme.

The Future Homes Standard sits outside the building safety regulations proper — it is an energy change — but it revises the same Building Regulations and lands on the same schemes. Published on 24 March 2026, it comes into force on 24 March 2027, or 24 September 2027 for higher-risk buildings. New homes will need low-carbon heating such as heat pumps, rooftop solar where practical, and improved fabric performance, with the aim of cutting carbon emissions by around 75% against 2013 standards.

Homes with a building control application in before 24 March 2027 can be built to the current Part L, provided work starts before 24 March 2028. After that date everything must meet the new standard.

This is the next phase of building safety regulations reform, and the one with the longest lead time.

In July 2026 the government confirmed it will create a single construction regulator, built on the Building Safety Regulator and covering buildings, the professionals who work on them and construction products. It needs primary legislation, so this is a change measured in years rather than months. The government response to the consultation sets out the plan.

Alongside it, an independent panel has recommended a single statutory building control system in which work is allocated to inspectors by risk and competence rather than chosen by the client. The government has accepted the principles and is developing a digital roadmap for building control. The direction of travel across all of these building safety regulations is consistent: more weight on competence, and more weight on accurate, accessible information about every building.

Scaffolding to the facade of a building undergoing refurbishment works

None of these changes is unmanageable on its own. What catches projects out is the combination — a scheme that now needs a second staircase, pays the levy, waits for Gateway 2 and has to meet a new Part L, all on the same appraisal. The earlier those questions are asked, the cheaper they are to answer.

Q10 Consulting works with building owners, developers and housing providers from feasibility and procurement through to delivery as main contractor, including refurbishment in occupied buildings. If you have a project affected by these building safety regulations and want a second opinion, get in touch for an initial conversation.

Building Refurbishment: A Practical Guide for Owners

Building refurbishment is the work of taking a building you already own and making it fit for what you need it to do next. It sits between light redecoration and full redevelopment, and it covers a wide range — a tired office brought up to modern standards, a listed façade repaired, a block of flats reroofed and rewired while people are living in it. What all building refurbishment projects share is that you are working with a building that already exists, with all the surprises that entails. This guide covers what refurbishment involves, how it differs from building new, what actually drives the cost, and how to keep a building running while the work goes on.

Building Refurbishment

Building refurbishment is usually a package of several trades rather than a single job. A typical scheme might include:

•     Stripping out existing finishes, partitions and services

•     Repairing or replacing the roof covering

•     Facade repair, cleaning, repointing or full facade restoration

•     Window and door replacement

•     Rewiring, new heating and upgraded ventilation

•     Insulation and fabric improvements to lift the EPC rating

•     Internal reconfiguration, which often brings in structural works

•     Fire safety upgrades — compartmentation, doors, alarms and escape routes

Where the layout changes, building refurbishment and structural work overlap. Removing a wall to open up a floorplate, forming a new stair opening or strengthening a floor for heavier use all sit in the structural package, and they carry the tightest constraints on the programme.

Building refurbishment in progress

Building refurbishment usually wins on planning, on carbon and on speed. You keep the structure, the foundations and often the facade, which means far less embodied carbon and frequently a shorter route through the planning system. In conservation areas it may be the only route available.

Where it gets harder is certainty. A new build starts from a known position; a refurbishment starts from a building whose history is partly unrecorded. Nobody can tell you what is behind a wall until it is opened up, and that gap between assumption and reality is where refurbishment budgets tend to move.

The practical answer is not to choose blind. A condition survey and a round of opening up before you commit will tell you far more about whether refurbishment stacks up than any amount of desktop appraisal.

Domestic Building refurbishment

Five things account for most of the variation between building refurbishment that lands on budget and one that does not.

Existing condition

Corroded steelwork, failed damp proofing, spalled concrete or a roof structure in worse shape than the survey suggested. All of it is findable in advance, and all of it is expensive to find late.

ASBESTOS

Any building constructed before 2000 needs a refurbishment and demolition survey before intrusive work begins. Removal is licensed work with its own programme, and discovering it mid-strip-out stops the job. The HSE guidance on asbestos surveys sets out what is required.

Regulatory upgrade

Refurbishment often triggers requirements the building has never had to meet — fire compartmentation, means of escape, accessibility, thermal performance. The Building Regulations approval process applies to material alterations as well as new work, and on higher-risk buildings the Building Safety Act gatekeeper points sit on top of that.

Access and scaffold

A town centre building with a pavement licence, a hoist and restricted delivery hours costs materially more to refurbish than the same building on an open site. Access is often the single largest preliminary on the job.

Working in occupied buildings

Phasing, out-of-hours working, temporary services and decant arrangements all add cost and time. They are also non-negotiable once residents or tenants are in place, so they need pricing at the outset rather than accommodating later.

Most refurbishment happens around people. Tenants stay in their flats, staff keep working, the shop below stays open. That reality shapes the whole job.

•     Phase the works so that no occupied area loses heating, water or power without notice and an alternative

•     Fix noisy operations to agreed hours and publish them, so complaints are about the noise rather than the surprise

•     Keep fire strategy live throughout — escape routes, alarm coverage and compartmentation must work on every day of the programme, not only at the end

•     Separate site access from resident access wherever the building allows

•     Give one named person for residents to contact, and answer them

Communication is not a soft extra on occupied refurbishment. Poor information is what turns a manageable programme into a stream of complaints, and complaints slow work down.

The right contract depends on how well defined the scope is. Where the survey work is thorough and the specification is settled, a traditional route with a fully priced bill gives you the most cost certainty. Where scope is still developing, design and build shifts more of the design risk to the contractor, at the cost of some control over specification.

Whichever route you take, refurbishment contracts live and die by their provisional sums and their variation mechanism. Unknowns are guaranteed. What matters is that there is an agreed, quick process for pricing and instructing them, rather than a dispute every time a wall comes down.

Refurbishment rewards investigation. Survey thoroughly, open up before you commit, understand the regulatory upgrades the works will trigger, and price access and phasing honestly at the start. The projects that overrun are almost never the ones where too much was known at the outset.

Q10 Consulting delivers building refurbishment for building owners, developers and housing providers — from condition survey and feasibility through procurement to delivery as main contractor, including occupied schemes. If you have a building that needs work, get in touch for an initial conversation.

Structural Works: 7 Things Building Owners Must Check

Structural works are the point at which a building project stops being cosmetic and starts affecting how the building stands up. Take out the wrong wall, form an opening without calculations, or excavate next to a neighbour without notice, and the consequences run from cracked plaster and an awkward conversation to a dangerous structure notice and a stopped site. This guide sets out what structural works actually cover, how to tell whether your project involves them, and the seven checks that keep the job safe, compliant and on programme.

Structural Works Balcony

Structural works are any works that alter, remove, support or add to the elements carrying load through a building — walls, beams, columns, floors, roofs and foundations. In practice that usually means:

•     Removing load-bearing walls or forming new openings in them

•     Installing steel beams, columns and goalpost frames

•     Underpinning, foundation strengthening and basement lowering

•     Forming or infilling floor openings for stairs and lifts

•     Loft conversions, dormers and roof alterations

•     Removing chimney breasts

•     Facade retention and facade restoration

•     Repairs to structural cracking, corroded steelwork or failed lintels

The distinction is not about how disruptive the work looks. Moving a stud partition is messy and non-structural. Cutting a service run deep into a masonry pier looks trivial and is not. If you are unsure, assume it is structural until an engineer tells you otherwise — that assumption costs a survey fee, and the opposite assumption has cost people a building.

•     The architect’s drawings note “beam over”, “SE to confirm”, or refer to engineer’s details

•     You are changing the use of a space in a way that increases floor loading — storage, plant, gym equipment, archive

•     There is diagonal cracking wider than a pound coin’s thickness, doors that stick seasonally, or noticeably sloping floors

•     You are opening up a terraced or semi-detached property anywhere near the shared wall

•     The building is older than 1950 and nobody can tell you what was done to it in the 1980s

Structural works extension

1. Establish what is actually load-bearing

Wall thickness is not proof, and an estate agent’s floorplan is not evidence. Establishing load paths properly means a measured survey, sight of any historic drawings, and opening up where the picture is unclear. Budget for opening up. It is the cheapest money you will spend on the whole package.

2. Commission a structural engineering inspection and calculations

A structural engineering inspection establishes the existing condition and load paths; the calculations that follow size the new members and specify the connections. Building control will want to see them, your contractor will price from them, and your insurer will want to know they existed. Getting this done before tender, rather than during, is the single biggest lever on final cost.

3. Confirm your building control and planning route

Structural works almost always engage the Building Regulations, in particular Part A for structure. You will need either a full plans application or a building notice, and for anything with an engineer’s calculations behind it the full plans route is usually the sensible one. Listed building consent and conservation area restrictions sit on top of this, not instead of it. GOV.UK sets out the building regulations approval process.

4. Deal with party wall matters early

Under the Party Wall etc. Act 1996 you must give two months’ notice for works to a party structure and one month for excavation near a neighbouring building or for building at the line of junction. Late notice is the most common avoidable cause of delay on urban structural works, and it is entirely self-inflicted. Serve early, before the programme is fixed. The GOV.UK party wall guidance explains what has to be served and when.

5. Survey for asbestos, services and hidden conditions

A refurbishment and demolition asbestos survey is a legal requirement before intrusive works in any building constructed before 2000. Alongside it, trace live services, check drainage runs beneath any proposed foundation work, and record what you find. Hidden conditions are the main reason structural works overrun, and most of them are findable in advance.

6. Choose a contract and procurement route that fits the risk

A small, well-defined package may sit comfortably under a JCT Minor Works contract. A larger refurbishment with sequencing complexity usually needs an Intermediate form. Where the scope is still developing and you would rather design responsibility sits with the contractor, a design and build route can be the better answer. Structural works carry more unknowns than any other package on a refurbishment, so the provisional sums, the contingency and the variation mechanism deserve more attention here than anywhere else in the contract.

7. Agree temporary works, sequencing and monitoring

Every permanent structural solution has a temporary one holding the building up while it is installed. Needling and propping schemes should be designed, not improvised, and someone should be named as responsible for them. Where there is existing movement, install telltales and monitor before, during and after. Agree hold points so nobody removes a prop on a Friday afternoon because the programme said so.

Under the Construction (Design and Management) Regulations 2015, the client carries duties that cannot be delegated, and on any project with more than one contractor a principal designer and a principal contractor must be appointed in writing. Structural works are high-risk by definition, so this is not a paperwork exercise: the principal contractor controls the site, the sequencing and the temporary works, and the client is expected to have satisfied themselves that whoever holds that role is capable of it. The HSE publishes guidance on CDM 2015 duty holders.

Costs move for predictable reasons: opening up reveals a different arrangement to the one assumed, temporary works turn out to be more involved than the tender allowed, or the making good around the new structure was priced optimistically. The steel itself is rarely the problem.

The practical defence is to price the whole package rather than the headline item — enabling works, propping, the structural element, making good, and the finishes that inevitably follow. A structural works package priced as steel plus labour will always come in over. One priced from an engineer’s drawings with a proper allowance for temporary works and reinstatement usually does not.

Structural works reward the time spent before anyone lifts a tool. Survey properly, engage an engineer early, sort building control and party wall notices before the programme hardens, and put the package under a contract that matches its risk. Do that and the works themselves are usually the straightforward part.

Q10 Consulting advises building owners, developers and housing providers on structural works from feasibility through to completion — survey and inspection, procurement and contract advice, and delivery as main contractor. If you have a project coming up and want a second opinion before you commit, get in touch for an initial conversation.